A clear route to technical support

Contact Eaton Ups project support

Tell us whether you are planning new capacity, replacing an installed unit, checking a battery path or resolving a service question. Include model and electrical context when available.

Project inquiries are triaged by application, location and requested date. Emergency site conditions must be handled by qualified local service personnel.

Eaton Ups project support coverage map and service desk

Project contact details

Eaton Ups Project Desk
1000 Critical Power Way
Raleigh, NC 27601, USA

Email
[email protected]

Phone
+1 800 555 0178

Hours
Monday–Friday, 08:00–17:00 ET

Social
Engineering updates · Support resources

What to include

Model or series, nominal voltage, phase, frequency, load in kW/kVA, autonomy target, bypass arrangement, destination and required date. Never work on energized equipment based only on remote guidance.

How inquiries are routed

A new-system request begins with electrical and runtime inputs. A replacement request also needs the installed nameplate, battery arrangement, clearances and accessory list. A maintenance question should include alarm text, event timing and service history, but never a live password. Shipment questions need the quotation reference, destination and requested date.

Published hours describe the project desk, not emergency response coverage. If equipment is hot, damaged, wet, emitting odor or presenting an electrical hazard, isolate the area under the facility safety procedure and contact qualified local service personnel. The website form is not an emergency channel.

Open a project inquiry

We use the submitted facts to identify missing inputs and route the request. Runtime and compatibility remain conditional until the configuration and operating assumptions are reviewed.

After intake, expect a request for any missing one-line diagram, measured load or installation detail before a configuration is treated as ready for quotation. Certification evidence is matched to the selected product series and destination rather than inferred from a brand name. Lead time is conditional until allocation and freight arrangements are confirmed in writing.

Submission is handled according to our Privacy Policy.

Prefer to prepare the technical file first?

Use the Project Support checklist before submitting your inquiry.

Review Project Support